Sorry for the delay. We're basically done with the physical installation, and all the wiring is finally over. But programming hasn't been completed yet, which will be where we actually configure all the lights & audio for the various scenes (warmup, steady-state, EDS triggered, etc). Due to the way the corridor connects into the house automation system, we've decided to wait until that's ready, which will be 2-3 months from now, sorry.
Here are some photos in the meantime. We pulled up the floor covering so the pallets are finally visible. While the corridor lights are on in these, there's a fair bit of extra light coming in from the mechanical room behind me.
Attachment:
InstallationDone1.jpg [ 723.37 KiB | Viewed 138 times ]
Attachment:
InstallationDone2.jpg [ 614.82 KiB | Viewed 138 times ]
Attachment:
InstallationDone3.jpg [ 256.31 KiB | Viewed 138 times ]